HV Ac

Designing and planning of Air conditioning system for comfort cooling/heating of multistoried buildings, offices, hotels, private residences, hospitals, auditoriums and all mechanical works like M.S structure compressor and dryer complete installation M S tanks Gas pipe line & Civil, Electrical.

Installation of Air conditioning system for comfort cooling/heating of multistoried buildings, offices, hotels, private residences, hospitals, auditoriums etc.

Our company has a very good team of qualified, well experienced engineers. Having vast experience on the field of heating, ventilation, air conditioning and refrigeration.

The company is fully capable of designing, supply, installing, commissioning, trouble shooting and maintaining any type and size of HVAC system.

Services

Every Organization faces challenges that push the boundaries of the Capabilities. Increased competition. Greater focus on added complexity is all major concerns. Our services help our clients further. To get profit from new opportunities and ensure the efficiency and capability needed for long.

We are committed to provide is high quality services in the Following fields:

  • EPM (Engineering, procurement, Manufacturing) Project Management
  • Feasibility Studies
  • Equipment Installation
  • Plant Commissioning
  • Front End Engineering Design
  • Complete field construction design including for process facilities
  • Detailed HVACR design including shop drawings
  • VRF system
  • Chillers AHUs CRACs
  • Ducting works
  • Plant Operation & Maintenance Annual Plant Turnarounds Copper piping works & all allied work
  • We offer Variety of mechanical services of utmost quality to our clients including
  • Assembly, installation, commissioning. These include
  • Stationary equipment installation
  • Rotary equipment installation
  • Stationary and rotary equipment dismantling
  • Carbon steel piping, fabrication and installation
  • Stain less steel 304, 3041, 316, 316 I piping fabrication and installation duplex
  • Piping, fabrication and installation. Aluminum welding works
  • Copper welding works
  • Shop manufacturing on site manufacturing Shop galvanizing
  • Tanks/ vessels fabrication and installation.
  • Steel structure fabrication and installation. Insulation
  • Painting

Rabi center, Lahore

  • Centrally air-conditioned water chiller with air handling units, fan coils units, cooling tower, pipelines, pump station & other works.

Crescent Bahaman ltd panda Bhatia

  • Centrally air-conditioned building. The air-conditioning system comprises of one no 100- USRT absorption type water chiller and allied equipment’s like cooling tower, pumping station, pipelines and fan coil units.

Malik Abad shopping mall Rawalpindi

  • Centrally air-conditioned multi story commercial building water chiller 661 USRT x 2 NO. Cooling towers, air –handling units, fan coils units, piping station and other allied works and complete installation.

Midway centrum Islamabad

  • Central air-conditioned multi stories commercial building. The air-conditioned system comprises of water chillers each 330-USRT each cooling tower, air handling units, fan coil units, piping work, pump station, ducting work etc.

Mobilink Lahore, Islamabad

  • Complete air-conditioning system comprises of 3-no packaged type water chillers of 165-USRT Capacity each along with air handling units, ducting, piping and other allied equipments.

Standard charted bank, Rawalpindi

  • Supply and installation of air cooled chilled 100 –USRT, A.H.U, duct work, pipe work and other allied work complete in all respects.

US denim mills Lahore

  • Supply and installation of self contained package type unit’s different capacity 200-USRT and complete duct work and related electrical work complete in all respects.

AZGARD Textile Lahore

  • Supply and installation of self contained package type units and floor standing units ,split units of different capacity 250-USRT complete in all respects.

Mayo hospital

  • Supply and installation of absorption chiller 50-USRT, AHU’s with hepa filters, ducting and piping work in all respects as joint venture with Mohatta Engineering.

JWT Lahore

  • Installation of 250-USRT hot water absorption chiller, cooling tower, pump station install with heat exchanger complete in all respects.

Interlope Pvt. Ltd Faisalabad

  • Supply and installation of HVAC works designing and supply chilled water fan coils units

Shalimar Hospital

  • Installation of complete self contained package type units different capacity 350-USRT and related electrical panel rooms and complete wiring.

Gold shopping mall Murree road, Rawalpindi

  • Installation of 200-USRT water cooled chillers complete in pipe work and installation with all respects..

Millennium shopping mall, Quetta

  • Installation of 500 -USRT chiller, cooling tower, pump station install with 20 no AHU, MS pipe work and duct work with material complete in all respects.

Dubai Kluwer Hydro Power Project

  • Installation & Testing of HVAC System.

505 Workshop, Peshawar Road, Rawalpindi

  • 55 Tons, Roof Top Package type units supply & Installation for Labs

Warid Telecom BTS Sites (Center 1 & Center 2)

  • 2 Ton Inverter based wall mounted splits supply, Installation & after sales support

SPD, Pakistan

  • 100 Tons DC Inverter based Light commercial Splits including Cassettes, Universal & Wall mounted units supply, Installation & after sales support

Local Retail outlet, Protection Sheet Corporation, Riyadh, KSA

  • 160 Tons Package Type units, Supply and installation

Riyadh Bank, KSA

  • 210 Tons Package Type units Supply and installation

King Fahad University, Riyadh, KSA

  • 160 Tons Package Type units, Supply and installation

Aramco Facility 1, KSA

  • 60 Tons Light Commercial Splits Supply and installation

Aramco Facility 2, KSA

  • 120 Tons Light Commercial Splits Supply and installation

Aramco Facility 3, KSA

  • 80 Tons Light Commercial Splits Supply and installation

45 Division Islamabad (APS Army Public School)

  • Supply and Installation of Fire Alarm, Fire Hydrant & HVAC system at APS Peshawar.

PWD (Civil Services Academy Walton Lahore)

  • Construction of Auditorium of 500 persons at Civil Services Academy Walton ( HVAC Consultancy).